A. REQUIREMENT PHASE
B. MITIGATION CONTROL
C. DESIGN MANAGEMENT
D. CHANGE CONTROL
View Answer
Software Engineering II MCQs
LET THE SOFTWARE A (WITH SIZE = 5000) AND B (WITH SIZE =3800) HAVE 1250 AND 950 DEFECTS RESPECTIVELY. WHICH ONE IS BEST OPTION?
A. A IS MORE DEFECTED THAN B
B. B IS MORE DEFECTED THAN A
C. A AND B BOTH ARE EQUALLY DEFECTED
D. NONE
View Answer
MTTC IS _______________.
A. TENDENCY ORIENTED METRIC
B. COST-ORIENTED METRIC
C. TIME ORIENTED METRIC
D. CHANGE-ORIENTED METRIC
View Answer
THE EXTENT TO WHICH A PROGRAM SATISFIES ITS SPECIFICATIONS AND FULFILLS THE CUSTOMER’S MISSION OBJECTIVES IS CALLED.
A. EFFICIENCY
B. MAINTAINABILITY
C. CORRECTNESS
D. USABILITY
View Answer
IN ORDER TO TRACK MITIGATION ACTIVITIES, _________ ACTIVITIES ARE PERFORMED.
A. CONTINGENCY
B. REFINEMENT
C. MONITORING
D. NONE OF THESE
View Answer
WHILE FOLLOWING RMMM STRATEGY, __________ ARE AVOIDANCE ACTIVITIES.
A. REFINEMENT ACTIVITIES
B. MITIGATION ACTIVITIES
C. CONTINGENCY ACTIVITIES
D. NONE OF THESE
View Answer
IF MITIGATION FAILS AND RISK BECOMES A REALITY THEN FOLLOWING PLAN IS FOLLOWED.
A. CONTINGENCY PLAN
B. QUALITY ASSURANCE PLAN
C. MANAGEMENT PLAN
D. BOTH (A) AND (C)
View Answer
IN CASE OF UNIDENTIFIABLE RISKS, WE HAVE CHOICE TO SELECT ________ APPROACH FOR RISK MANAGEMENT.
A. JUST REACTIVE
B. JUST PROACTIVE
C. BOTH (A) AND (B)
D. DEPENDS ON CHOICE EITHER (A) OR (B)
View Answer
PROJECT RISKS ARE RELATED TO.
A. REQUIREMENTS
B. DESIGN
C. IMPLEMENTATION
D. TESTING
View Answer
ASSUMING THAT THERE IS A SITUATION THAT CAN BE FACED BY A SOFTWARE DEVELOPER IN FUTURE WITH PROBABILITY =0.78 AND WITH NO LOSS. THIS TYPE OF SITUATION IS CALLED.
A. RISK
B. TECHNICAL RISK
C. PROJECT RISK
D. NONE
View Answer